While we wait for the hornblocks to be shipped to our engineering base at CTL Seal, design work has been moving on apace. Here are a series of updated CAD drawings (all courtesy of Alan Parkin), showing the most recently completed component, the middle cylinder and its location within the frames.
This CAD drawing shows the location of the left hand and middle cylinders, together with the front bogie.
Front LHS showing left hand cylinder and the proposed location of the air pump.
Front view showing all three cylinders.
Middle Cylinder
Tilted view to show the location of the springs.